Sunday, June 17, 2012

Sunday afternoon at Bob

Hi Julie!

We've been lame on posting to the blog! Sorry but we were wiped out from the hectic week. Anyway we are settled in and still unpacking and organizing a bit. But everything is fine here and sounds like you are having so much fun in Salzburg, the opera, museums, design studios, etc.... The violin maker sounded cool! Illattach some pictures of the house. Basically they put the windows in and did some more of the plumbing rough in. Also they framed the bathroom in the basement and started the electrical rough in. We will meet the electrician on Wednesday to do our first walk through and pick outlet locations and light fixture locations so that should be fun. We also decided to go back to laminate countertops and sinks on the secondary bathrooms. It was going to cost us $4000 todo cultured marble so be bailed on that idea! (sorry but it will be nice don't worry). We did agree to do the pot filler in the kitchen ($1400!!)

What should we do with lights or ceiling and in the great room??

Let's skype tonight. We are all set up to do it. Just text me when you want to do it.

That's all for now. Love you sweetie.

Daddy

Ps there is one picture of Erin Smiley and the guy that did the closing papers. She is so young!!!

No comments:

Post a Comment